The construction of a bicycle garage in Sweden began in September 2019.
Within the scope of work, Exbud Konstrukcje Sp. z o.o. executed, delivered and assembled the steel structure of the building, including stairs, railings, as well as trapezoidal sheet and perforated facade sheet.
The assembly was divided into four stages, where the steel structure was assembled alternately with reinforced concrete works.
The works were completed in April 2020.